Acorn Pipe Material Control It is a great advantage to put one Spool per drawing as this will be the only way to track individual spools. All tracking and records are generated by drawing. For example it will not be possible to issue part of a drawing for fabrication 11.63 Kb. 1
Table of Contents. Page Nos. Part-a about Us 2-3 Services We Provide 4-5 The company has vast experience in Planning, Installation, network integration and Maintenance of Switching & Transmission Networks and also has an in house world class iso 9000 certified Telecom Training Institute 1.72 Mb. 6